The day has finally come to deal with the kid bathroom. The floor is slanting, the cabinet is crumbling, and it was time to figure this out. Since it is thanksgiving break.... we decided to tackle this project. It isn't a full remodel, but we are replacing the flooring (after pulling out the old and fixing the subfloor), replace the cabinet and the counter, then probably have to either paint or replace all the trim. I can't express how much I would love to remove the second door and second switch, but that is not meant to be right now.
The befores: (aren't we proud that I remembered?)
No comments:
Post a Comment